FIELD TESTING, Germany
PILOT PHASE – FIELD TESTING ACROSS FOUR SITES


Why four pilot sites?
- CO₂ source characteristics
Different facilities provide different CO₂ compositions and operational profiles.
Testing across these conditions helped ensure stable reactor performance and process control.
- Water chemistry and local mixing conditions
Water is the reaction environment.
Parameters such as pH, temperature, salinity influences, and baseline alkalinity directly affect reaction behavior and operational stability.
- Mineral feedstock handling and sourcing
Mineral feedstock is a key lever in our process.
The pilot phase allowed us to test handling, dosing, and operational consistency under different site realities.
- Integration into existing infrastructure
Scale requires integration into real plants — not rebuilding facilities from scratch.
Our pilots were designed to connect with existing industrial and municipal systems, validating installation, operation, and practical uptime.


From prototype to operational readiness
Planeteers’ first prototype reactor was developed in 2023 and then intensely tested across multiple sites in 2024.
This pilot phase was not about claims – it was about building operational confidence.
The result
A robust technology baseline to safely move from field testing to a validated production unit, and to support future commercial deployments.
From pilots to production
Pilot sites gave us the key lesson early:
Scaling carbon removal means engineering for variability, not ideal conditions.
The learnings from Hamburg, Hetlingen, Kiel, and Wuppertal directly shaped our first production deployment — and continue to define the engineering requirements for commercial-scale plants with measurable, permanent climate impact.
realized with our Partners





Take a look at our projects